Skip to content
Tuibruggen

Projects GWW

Cable-stayed bridges

The main construction of a cable-stayed bridge consists of a walking deck, which is suspended from inclined cables that are guided to the abutments via the tops of pylons.

Cable-stayed bridges

Except for the cable, all parts can be made of wood, with free spans up to 90 meters possible. A cable-stayed bridge can be constructed with 1 or 2 pylons, whereby the shape of the pylon can be varied, for example an A shape.

Projects cable-stayed bridges

Cable-stayed bridges

More information?

If you would like to know more about our options, please contact: Wijma Kampen B.V. telephone number: +31 38-3316444 or by mail: wijma@wijma.com.

Leave your details in this form and we will contact you.